Brocade Multi-Service IronWare Switching Configuration Gui Manual do Utilizador Página 690

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 984
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 689
660 Multi-Service IronWare Switching Configuration Guide
53-1003036-02
MCT for VRRP or VRRP-E
18
FIGURE 181 Example of MCTS that are Layer 2 switched
In Figure 182, MCTs are deployed on two sites that are connected through two WAN links.
Two WAN links are completely independent. Switch A and B form MCT 1 and switch C and D
form MCT 2. There are L2 protocols running on the VRRP-E routers. L2 protocols will block one
of the WAN links to ensure loop-free topology.
Vista de página 689
1 2 ... 685 686 687 688 689 690 691 692 693 694 695 ... 983 984

Comentários a estes Manuais

Sem comentários